Shift handover checklist for an AV fleet depot: what the outgoing lead hands over and the incoming lead checks

A handover is three steps, not one conversation: the outgoing lead prepares, both leads go through the log face to face, and the incoming lead checks the yard before taking over. What goes in the log at an AV fleet depot, and the items that get dropped.

By XoomPark Editorial Team ·

A handover has three parts, and the conversation is only the middle one. The outgoing lead prepares; both leads exchange the information; the incoming lead cross-checks it as they take responsibility. HSE, the UK safety regulator, adds that it should be face to face, two-way with both people sharing responsibility, and use both spoken and written communication.1 At an AV fleet depot the written log covers seven things: every car's status, charging still running, chargers out of service, locks and tags still on equipment, defects not yet certified, open actions with an owner, and a short watch list.
The depot handover log. The outgoing lead fills the middle column before the handover; the incoming lead works through the right-hand column before signing.
ItemOutgoing lead recordsIncoming lead checksBasis
Cars by statusA count per status: ready, charging, cleaning, inspection hold, repair, recall holdWalks the yard and matches cars to the listOur depot practice
Charging in progressCar, stall, charge target and expected finish timeFinish times still hold; no car is waiting behind a full oneOur depot practice
Chargers out of serviceStall, fault, ticket number and who owns the fixStall is tagged and the ticket is openOur depot practice
Locks and tagsEvery lockout or tagout still on a charger, bay or lift, and who holds itProtection passes to a named oncoming person before the holder leavesOSHA 1910.147(f)(4)2
Defects not certifiedCar, defect and work orderCar stays held until the repair is certified49 CFR 396.113
Open actionsAction, owner on the next shift, due timeEvery action has a name from the incoming shiftHSE;1 I-PASS action list4
Watch listIf-then items: if a car is not at target by 05:00, move it to stall 4Reads the list back in their own wordsI-PASS4

What should the outgoing shift lead prepare before the changeover?

The log, built around what the incoming lead will need rather than a diary of the night. HSE says the content should rest on an analysis of the information needs of incoming staff, and that the handover should get as much time and resource as it needs.1
  • Count cars by status from the record, not from memory. Each car carries one status, the one that will take longest to clear, as in the readiness gate.
  • List every charging session that will finish on the next shift, with its expected finish. These are the cars that turn into ready cars without anyone touching them, so they are the ones the incoming lead can plan around.
  • List every stall out of service with its ticket and owner. A faulted stall with no owner is how a car ends up waiting all night behind it.
  • Mark the handover as higher risk if maintenance is half finished on a car or a charger. HSE notes that most accidents traced to handover failures involved planned maintenance work, and advises planning maintenance to finish within one shift where possible.1

How do you run the handover so the incoming lead catches what is missing?

Use a fixed order and make the receiver say it back. Hospitals have tested this more than any other field. The I-PASS format runs: how serious each case is (stable, watcher or unstable), a short summary, an action list for the receiver, situation awareness and contingency plans in an if-then form, and a synthesis by the receiver, who asks questions and confirms the plan.4

The evidence is from hospitals, not depots, so read it as a pointer. In a nine-hospital study of 10,740 admissions, the I-PASS program cut the medical-error rate by 23 percent (24.5 to 18.8 per 100 admissions) and preventable adverse events by 30 percent (4.7 to 3.3), while the spoken handoff took about the same time: 2.4 minutes per patient before and 2.5 after.5 The useful finding for a shift lead is the last one: a fixed order did not make the handover slower.

At a depot, read the cars the same way. Stable: ready or charging on plan. Watcher: charging behind plan, or a stall that faulted once tonight. Unstable: a car with an uncertified defect or a lock still on it. Go through the unstable cars first, then the watchers, and skip the stable ones beyond the count.

How do locks and tags on chargers pass between shifts?

By a written procedure, every time. OSHA's lockout rule requires specific procedures during shift or personnel changes to keep lockout or tagout protection continuous, including the orderly transfer of that protection between off-going and oncoming employees.2

The rule sets the requirement, not the sequence. Our assumption, and a common way to meet it: the oncoming person puts their own lock on the charger or bay before the off-going person takes theirs off, so the equipment is never without a lock, and both names go in the log. If nobody on the incoming shift will hold the lock, the work stays stopped and the log says so. A charger with a lock on it and no named holder in the log is an open item, however quiet it looks.

Which open defects stop a car from leaving the depot after the changeover?

Any defect likely to affect safe operation that has not been repaired and certified. The federal inspection rule we use as the model says a carrier must repair such a defect before letting the vehicle operate, and must certify that it was repaired, or that repair was unnecessary, before the vehicle is operated again.3

The handover is where that certification gets lost: the night technician fixed it, the day lead never saw the signature. List every car with a defect in the log, with the work order, and leave it on hold until the incoming lead sees the certification. The same rule keeps the report and the certifications for three months, and allows them in electronic form.3 It was written for commercial motor vehicles and exempts some operations, such as carriers running a single commercial vehicle;3 whether it covers your cars is for your compliance lead.

A worked example: the 06:00 changeover

At 06:00 the log shows 60 cars: 41 ready, 9 charging, 3 cleaning, 4 on inspection hold, 2 in repair and 1 on recall hold. These numbers are an example, not measured figures.

The incoming lead does not need all 60 read out. They need the 41 as a count, the 9 charging cars with finish times (7 on plan, 2 behind because stall 6 faulted at 03:10, ticket open, technician named), the 4 inspection holds with their defects, the 2 repair cars with one lock still on a lift, and the recall car's status. That is about 16 cars to talk through, unstable ones first. Our assumption: plan 15 minutes of overlap for a log this size, and longer when maintenance is half done.

When the charging rows keep growing because the depot is short of stalls, XoomPark arranges AV fleet charging at existing stations in the hours their stalls sit unused, never blocks a station's regular customers and never pushes the station past its monthly peak.

When this checklist is the wrong tool

  • You are deciding whether a car is ready for service. That is the readiness gate; the handover only carries each car's status across.
  • The handover is for an incident in progress, such as a crash or an injury. Follow the depot's emergency procedure and the incident commander, not a shift log.
  • You need the lockout procedure itself. OSHA requires a written energy-control program;2 this page only covers passing protection across a shift change.
  • The question concerns the driving system on the car. Those checks belong to the vehicle's maker and its trained staff, and nothing in a handover log replaces them.

Questions shift leads ask

What should a depot handover log include?

Cars by status, charging still running with finish times, chargers out of service with owners, every lock and tag with its holder,2 defects not yet certified,3 open actions with a named owner on the incoming shift, and a short if-then watch list.4

Should a shift handover be written or spoken?

Both. HSE says handover should use both verbal and written communication, face to face and two-way.1 The log carries the detail; the conversation is where the incoming lead asks about what does not add up.

How long should a shift handover take?

Long enough for the log, and longer when maintenance is half done. HSE says to give it as much time and resource as necessary.1 In the hospital I-PASS study a fixed format did not lengthen the spoken handoff, which stayed at about 2.4 to 2.5 minutes per patient.5

Who is responsible for a car during the handover?

The outgoing lead until the incoming lead has cross-checked the log and signed it. HSE describes the incoming shift cross-checking the information as it assumes responsibility.1 Until then nothing transfers, including locks.2

How long should handover logs be kept?

No rule sets this for a depot log. The federal inspection rule keeps defect reports and their certifications for three months, electronically if you like;3 keeping the handover log for the same period is our recommendation.