Shift handover checklist for an AV fleet depot: what the outgoing lead hands over and the incoming lead checks
A handover is three steps, not one conversation: the outgoing lead prepares, both leads go through the log face to face, and the incoming lead checks the yard before taking over. What goes in the log at an AV fleet depot, and the items that get dropped.
By XoomPark Editorial Team ·
| Item | Outgoing lead records | Incoming lead checks | Basis |
|---|---|---|---|
| Cars by status | A count per status: ready, charging, cleaning, inspection hold, repair, recall hold | Walks the yard and matches cars to the list | Our depot practice |
| Charging in progress | Car, stall, charge target and expected finish time | Finish times still hold; no car is waiting behind a full one | Our depot practice |
| Chargers out of service | Stall, fault, ticket number and who owns the fix | Stall is tagged and the ticket is open | Our depot practice |
| Locks and tags | Every lockout or tagout still on a charger, bay or lift, and who holds it | Protection passes to a named oncoming person before the holder leaves | OSHA 1910.147(f)(4)2 |
| Defects not certified | Car, defect and work order | Car stays held until the repair is certified | 49 CFR 396.113 |
| Open actions | Action, owner on the next shift, due time | Every action has a name from the incoming shift | HSE;1 I-PASS action list4 |
| Watch list | If-then items: if a car is not at target by 05:00, move it to stall 4 | Reads the list back in their own words | I-PASS4 |
What should the outgoing shift lead prepare before the changeover?
- Count cars by status from the record, not from memory. Each car carries one status, the one that will take longest to clear, as in the readiness gate.
- List every charging session that will finish on the next shift, with its expected finish. These are the cars that turn into ready cars without anyone touching them, so they are the ones the incoming lead can plan around.
- List every stall out of service with its ticket and owner. A faulted stall with no owner is how a car ends up waiting all night behind it.
- Mark the handover as higher risk if maintenance is half finished on a car or a charger. HSE notes that most accidents traced to handover failures involved planned maintenance work, and advises planning maintenance to finish within one shift where possible.1
How do you run the handover so the incoming lead catches what is missing?
The evidence is from hospitals, not depots, so read it as a pointer. In a nine-hospital study of 10,740 admissions, the I-PASS program cut the medical-error rate by 23 percent (24.5 to 18.8 per 100 admissions) and preventable adverse events by 30 percent (4.7 to 3.3), while the spoken handoff took about the same time: 2.4 minutes per patient before and 2.5 after.5 The useful finding for a shift lead is the last one: a fixed order did not make the handover slower.
At a depot, read the cars the same way. Stable: ready or charging on plan. Watcher: charging behind plan, or a stall that faulted once tonight. Unstable: a car with an uncertified defect or a lock still on it. Go through the unstable cars first, then the watchers, and skip the stable ones beyond the count.
How do locks and tags on chargers pass between shifts?
The rule sets the requirement, not the sequence. Our assumption, and a common way to meet it: the oncoming person puts their own lock on the charger or bay before the off-going person takes theirs off, so the equipment is never without a lock, and both names go in the log. If nobody on the incoming shift will hold the lock, the work stays stopped and the log says so. A charger with a lock on it and no named holder in the log is an open item, however quiet it looks.
Which open defects stop a car from leaving the depot after the changeover?
The handover is where that certification gets lost: the night technician fixed it, the day lead never saw the signature. List every car with a defect in the log, with the work order, and leave it on hold until the incoming lead sees the certification. The same rule keeps the report and the certifications for three months, and allows them in electronic form.3 It was written for commercial motor vehicles and exempts some operations, such as carriers running a single commercial vehicle;3 whether it covers your cars is for your compliance lead.
A worked example: the 06:00 changeover
The incoming lead does not need all 60 read out. They need the 41 as a count, the 9 charging cars with finish times (7 on plan, 2 behind because stall 6 faulted at 03:10, ticket open, technician named), the 4 inspection holds with their defects, the 2 repair cars with one lock still on a lift, and the recall car's status. That is about 16 cars to talk through, unstable ones first. Our assumption: plan 15 minutes of overlap for a log this size, and longer when maintenance is half done.
When the charging rows keep growing because the depot is short of stalls, XoomPark arranges AV fleet charging at existing stations in the hours their stalls sit unused, never blocks a station's regular customers and never pushes the station past its monthly peak.
When this checklist is the wrong tool
- You are deciding whether a car is ready for service. That is the readiness gate; the handover only carries each car's status across.
- The handover is for an incident in progress, such as a crash or an injury. Follow the depot's emergency procedure and the incident commander, not a shift log.
- You need the lockout procedure itself. OSHA requires a written energy-control program;2 this page only covers passing protection across a shift change.
- The question concerns the driving system on the car. Those checks belong to the vehicle's maker and its trained staff, and nothing in a handover log replaces them.
Questions shift leads ask
What should a depot handover log include?
Should a shift handover be written or spoken?
How long should a shift handover take?
Who is responsible for a car during the handover?
How long should handover logs be kept?
Sources
- UK Health and Safety Executive (HSE): Shift handover, human factors guidance
- OSHA, 29 CFR 1910.147, The control of hazardous energy (lockout/tagout) (eCFR)
- U.S. Federal Motor Carrier Safety Administration, 49 CFR 396.11, Driver vehicle inspection report(s) (eCFR)
- AHRQ Patient Safety Network: Handoffs and Signouts (primer on I-PASS and SBAR)
- Starmer AJ et al., Changes in medical errors after implementation of a handoff program, N Engl J Med 2014;371:1803-12 (PubMed)
Sources are public. XoomPark isn't affiliated with the companies referenced in this post.