Data · Waymo depots
Waymo depots: where the cars charge, park and get fixed
Waymo has 28 depot and charging sites on public record in 15 US metros, 10 of them operating. Most sit in industrial areas at the edge of the service zone, often near an airport.
By Greg Bessoni, Founder and CEO, XoomPark ·
XoomPark is independent and is not affiliated with Waymo LLC, Alphabet Inc. or any company named here.
| Question | Short answer |
|---|---|
| Where do Waymos go at night? | Back to a depot to charge and get cleaned, or to a nearby lot to wait for the morning rush. |
| Where do Waymos charge? | Mostly at their own depots. In newer cities, also at public fast chargers until dedicated charging is built. |
| Who runs the depot? | Waymo in San Francisco and San Antonio. Partners elsewhere: Moove in Phoenix and Miami, Avis Budget Group in Dallas, Avomo in Austin and Atlanta, Flexdrive by Lyft in Nashville. |
| How many depots exist? | 28 sites on public record in 15 metros, 10 operating. |
Where do Waymos go at night?
To the depot, mostly. Waymo’s San Francisco depot sits in the Bayview industrial corridor and is widely described as the country’s largest operating robotaxi depot. Workers plug the cars in, clean the interiors, and do routine maintenance such as brakes and fluids, plus Waymo-specific work like replacing lidar and other sensors.1
Not every car goes home at the same time. Fleets thin out overnight as demand drops, and the cars that stay out wait on lots closer to riders. That is where the trouble has come from. In August 2024, Waymo cars waiting on a lot at 2nd and Harrison Streets in San Francisco honked at each other while backing into spaces, with neighbors reporting a peak around 4 a.m. Waymo pushed a software fix on August 13, 2024, and the cars then honked in the cul-de-sac next door until a second fix.1
The pattern is the point. A robotaxi has nowhere to be between 1 a.m. and 6 a.m. except a depot or a lot, and whichever one it picks has neighbors.
Depot Daily
The lots and yards that could become the next depot, in your market.
Where do Waymos charge?
At depots first. Waymo has said that as its operations in a city mature, it builds its own charging and prioritizes dedicated charging, and that until then it also uses public stations and tries to limit and stagger its use.1 That is when drivers at public fast chargers start noticing the robotaxis in the queue.
The charging behind the depots is large:
- San Francisco. In 2022 Waymo’s depot there had 19 direct-current (DC) charging stations with more than 2 megawatts of total load, one of the largest charging sites in the city at the time.1
- Dallas. The permanent depot Avis Budget Group is building has about 10 Alpitronic HYC-400 chargers with four handles each, roughly 40 fast-charging points.2
- Nashville. Flexdrive by Lyft says its 80,000-square-foot depot has dozens of chargers that can support hundreds of autonomous vehicles, and that Waymo vehicles would move in from October 12, 2026.1
Every Waymo depot on public record, by metro
We count 28 Waymo depot, service and charging sites on public record across 15 metros: 10 operating, 1 under construction, 1 permitted, 6 planned and 10 reported but unconfirmed.1 We show each site by general area only, never a street address; the ones with no published location are listed by city.
The map shows Waymo’s sites; click a city to list them, or a pin for its status and source. The full robotaxi depot map adds every other fleet and charging operator on record.
Waymo depot map
12 sites on the map in 9 cities · 16 reported, location not published
See who runs each depot
Company names are for approved members. Create a free account and ask for access; we approve by hand, usually within a day. Your request includes Depot Daily for your market, free.
Sign up for accessHave an account? Sign in. Just want the newsletter? Get Depot Daily.
Each square marks a general area, not a site
Reported, location not published
Not on the map and not counted in a city above.
Austin · 2
Dallas · 2
Los Angeles · 2
Miami · 2
Phoenix · 2
Atlanta · 1
Denver · 1
Houston · 1
Nashville · 1
Orlando · 1
San Diego · 1
| Metro | Area on record | Status | Who runs it |
|---|---|---|---|
| San Francisco | Bayview industrial area | Operating | Waymo, with contractors |
| Los Angeles | Sawtelle, West LA, plus satellite lots | Reported | Not published |
| Santa Monica | Two charging lots near homes | Operating, in litigation | Charging operator Voltera |
| Phoenix | South of the downtown Warehouse District; service sites in Mesa and Chandler | Reported | Waymo, with fleet partner Moove |
| Austin | Southeast Austin | Operating | Avomo |
| Dallas | Three sites: a temporary depot in a West Dallas commercial park and an Avis-linked depot in East Dallas, no addresses published3; the permanent depot under construction, under 5 miles from Love Field2 | Two operating; one under construction | Avis Budget Group |
| Houston | Greater Fifth Ward | Operating | Not published |
| San Antonio | Northeast Side | Operating (Waymo, Nov 3 2026) | Waymo |
| Atlanta | About 5 miles north of downtown | Operating | Avomo |
| Miami | Wynwood, near the Design District; a second site permitted next to Miami International Airport. No addresses published | Operating and permitted | Moove |
| Nashville | Near Nashville International Airport, plus a smaller micro-depot in the city | Opened Oct 2026; micro-depot reported | Flexdrive by Lyft |
| Tampa | Near Tampa International Airport | Planned (reported lease) | Not published |
| Washington, D.C. | Northeast D.C.: a service facility in Langdon and a charging depot in Ivy City | Planned | Not published |
| San Diego | Not published | Planned | Element Mobility |
| Denver, Orlando | Not published | Planned (Denver), reported (Orlando) | Not published |
Why Waymo depots sit at the edge of the city
Land, power and neighbors. A depot needs acres, megawatts and a use the city will permit around the clock, and all three are cheapest in industrial areas near airports and rail lines. The cost is distance: every car that goes back to the depot drives there empty.
Santa Monica shows what happens when a charging site sits near homes. Waymo began charging at two lots near homes in 2024. Neighbors complained about noise and late-night work, and in November 2025 the City Council voted 6-0 to declare the lots a public nuisance and ordered overnight operations stopped. City staff measurements found the noise did not break the city’s noise ordinance, so the case rests on nuisance law instead. Waymo sued. In July 2026 a judge barred use of the lots between 11 p.m. and 6 a.m., and an appeals court then stayed that order while the case continues.1
Dallas shows the other constraint, power. While its permanent depot is built, Waymo charges its Dallas fleet on temporary fast chargers mounted on skids and powered by Aggreko generators, not a grid connection.2 The fleet was already running driverless service around the clock, and it was waiting on the grid.
The cost of the trip back
An empty drive to the depot is deadhead: miles with no rider and no fare. An infrastructure founder told The Road to Autonomy that under today’s depot model a car can be out of service for about two hours per servicing run, up to three times a day.4
Here is the arithmetic with the assumptions in the open. Take an 18-hour operating day and one paid trip per hour. Two depot runs of two hours each remove four trips, about a fifth of the day. Three runs remove six, a third. Waymo does not publish trips per vehicle or depot cycle times, so read this as a shape, not a measurement. The loss grows with distance to the depot and with how often the car has to go.
That is why the next layer is small sites inside the service zone: a lot or garage near riders where a car can top up during a lull instead of crossing town. We worked through the full model in Six Lost Hours a Day, and through where the grid has room for in-zone charging in Where can robotaxi depots actually get power?
We use your unused stalls, never fill them so a retail customer can’t charge, and never make you go over your monthly peak.
What the public record leaves out
We built our count from public records, field reports and news coverage, rebuilt on November 6, 2026.1 Of 28 Waymo records, 10 are confirmed operating and 10 are reported but unconfirmed. We publish none of their addresses: the map shows each by general area.
| Status | Records | What it means |
|---|---|---|
| Operating | 10 | Seen in use by a reporter, field observer or official source |
| Under construction | 1 | A building permit and construction seen |
| Permitted | 1 | A permit or filing exists; no operations seen |
| Planned | 6 | Announced or leased, not yet open |
| Reported | 10 | Named in one source, not confirmed |
What no public source gives: how many cars each depot holds, how much power each one draws, and how far the average car drives empty to reach it. Charger counts leak out through permits and field visits. Electrical load and empty miles do not.
When this page is not for you
If you are looking for a job at a Waymo depot, go to Waymo’s careers page and the depot partners’ hiring pages; Flexdrive says it is hiring more than 70 people in Nashville.1
If you want to lease land to Waymo for a full depot, read Can I Lease My Land to Waymo or Tesla for a Robotaxi Depot? first, because in most cities the partner, not Waymo, signs the lease.
If your site is a small lot next to homes, Santa Monica is the warning: overnight charging there drew a nuisance order even though the noise met the code. If it is a lot or garage inside a robotaxi zone with room for a few cars, list it free.
Questions people ask
Where do Waymos go when they are not driving?
To a depot to charge and get cleaned, or to a lot near riders to wait. Waymo does not publish its waiting lots, which is why most people find them through neighbors’ complaints.
Where is the Waymo depot in San Francisco?
In the Bayview industrial area, in the southeast of the city. It is widely described as the largest operating robotaxi depot in the country, and Waymo has said it has run for about five to six years.
Does Waymo use public charging stations?
Yes, in cities where its own charging is not built yet. Waymo says it moves to dedicated charging as each city matures, and that it tries to limit and stagger its use of public stations until then.
How big is a Waymo depot?
Flexdrive’s Nashville depot for Waymo vehicles is 80,000 square feet. Waymo publishes no standard size.
Want the next depot sites in your market?
Sources
- XoomPark research: robotaxi depot records, see the full robotaxi depot map
- The Road to Autonomy: Waymo Dallas Avis depot and active operations field report, Oct 12, 2026
- The Road to Autonomy: Waymo Dallas field report, Mar 30, 2026
- The Road to Autonomy, transcript: Building, Deploying and Scaling Autonomous Robotaxi Infrastructure
Depot counts are XoomPark’s tally of public records as of November 6, 2026. XoomPark is an independent platform. It is not affiliated with, authorized by, endorsed by or in any way officially connected with Waymo LLC, Alphabet Inc., Zoox, Inc., Amazon.com, Inc., Tesla, Inc. or any other company shown, or with any of their subsidiaries or affiliates. Company names are trademarks of their respective owners and are used here for identification only. A site or service area shown here does not mean the company works with XoomPark.
Authorship
Written by Greg Bessoni in collaboration with Claude Opus 5.5
Role breakdown: Strategy, structure and final verification by Greg Bessoni; research synthesis and draft prose by Claude Opus 5.5.