Demand charge management for site hosts: what sets your bill and how off-peak load fits
One busy half hour can set a fast-charger host's power bill for the month. Which rate you are on, whether the chargers share your meter, and what overnight AV fleet load adds on each rate, with the math.
| Rate type | How demand is billed | What an overnight session below your peak adds |
|---|---|---|
| Maximum-demand rate (FPL GSD-1) | $12.70 per kW of the month's highest 30-minute demand, any hour1 | Energy only: 2.825 cents per kWh base1 |
| Time-of-use demand rate (FPL GSDT-1) | $11.90 per kW of on-peak demand plus $0.79 per kW of maximum demand1 | Off-peak energy only: 1.524 cents per kWh base1 |
| EV rate with a demand limiter (FPL GSD-1EV) | GSD-1 prices, but billed demand never exceeds the month's kWh divided by 75 hours1 | While the limiter binds, about 16.9 cents of demand charge per added kWh ($12.70 ÷ 75), plus energy |
| Subscription rate (PG&E BEV-2-S) | $95.56 per 50 kW block, $3.82 per kW overage2 | Off-peak energy: $0.15654 per kWh, 9 p.m. to 9 a.m.2 |
What is a demand charge on a power bill?
The energy charge is the opposite: it scales with kWh and does not care when. That split is why demand charges hurt fast-charger hosts more than most businesses. A few cars charging at once can set a peak of hundreds of kW while the month's energy stays small. RMI's 2017 analysis of fast-charging tariffs found demand charges can make up as much as 90 percent of the monthly bill under certain tariffs,6 and NREL's 2019 rates study found that low utilization leads to significantly higher electricity cost, particularly for rates with demand charges.4
You are not unusual for facing one. NREL's survey of U.S. demand charges counted nearly 5 million commercial customers, over a quarter of 18 million, who can subscribe to tariffs with demand charges above $15 per kW.3
Which rate are your chargers on, and why does it decide everything?
FPL's time-of-use rate, GSDT-1, bills most demand only in on-peak hours: weekdays 6 to 10 a.m. and 6 to 10 p.m. from November through March, and weekdays noon to 9 p.m. from April through October, excluding listed holidays.1 Every hour from 11 p.m. to 6 a.m. is off-peak all year, so overnight charging there can only touch the $0.79 per kW maximum demand charge, and only if it sets a new monthly maximum.
PG&E's business EV rate, BEV, replaces the customer charge and traditional maximum kW demand charge with a subscription-based model for monthly kW allocation.2 You pick a kW level in advance and pay an overage fee above it, so the question there is whether overnight load stays under the subscription, not under a peak you set by accident. These schedules also carry fuel charges, riders and taxes that we leave out here; the demand mechanism is what changes the answer.
Should your chargers share the store's meter or get their own?
A shared meter spreads the charger's peaks over the building's load, so a small, lightly used station does not carry its own demand charge alone. The tradeoff is stacking: a charger session at 3 p.m. on top of the store's air conditioning can set a combined peak higher than either alone.
A dedicated meter opens EV-specific rates. FPL's GSD-1EV applies only to public charging with a measured demand of 25 kW to under 500 kW, furnished through a dedicated meter, with a term of not less than one year.1 Price both before you sign anything with a charging company or a fleet.
How do hosts keep the peak down?
| Lever | What it does to the demand charge | Tradeoff |
|---|---|---|
| Site power cap | Holds the 15- or 30-minute peak under a set kW | Drivers charge slower when every stall is busy |
| Staggered starts | Stops several sessions ramping in the same interval | Needs network software that can sequence sessions |
| Off-peak scheduling for AV fleets | Moves added load to hours that do not set your demand on time-of-use or subscription rates | Only works with a customer who can charge at night |
| Battery storage | Shaves short peaks from storage instead of the grid | Capital cost; best on spiky, low-use sites |
| Rate choice | Changes what a peak costs at all | Term commitments and meter requirements |
The depot side of this, from a fleet's own yard, is in our guide to demand charges for AV fleet charging, including how a ratchet can bill one summer peak for a year.
Our worked example: the same overnight load on three FPL rates
Method: our arithmetic from FPL's published base rates, not a measured bill. Assumptions: a public four-stall site with an actual 30-minute peak of 400 kW that it already reaches with retail drivers, 15,000 kWh a month of retail sales, and an AV fleet adding 7,200 kWh a month overnight (240 kWh a night for 30 nights) under a 400 kW site cap, so the overnight load never sets a new peak.
| Rate | Demand charge before | Demand charge after | Added base charges for 7,200 kWh |
|---|---|---|---|
| GSD-1 | 400 kW × $12.70 = $5,080 | $5,080 | $203 energy (2.825¢ × 7,200) |
| GSD-1EV | 15,000 ÷ 75 = 200 kW billed, × $12.70 = $2,540 | 22,200 ÷ 75 = 296 kW billed = $3,759 | $1,219 demand + $203 energy |
| GSDT-1 | Set by on-peak use | Unchanged (overnight is off-peak, under the maximum) | $110 energy (1.524¢ × 7,200) |
Read GSD-1EV carefully. The limiter is generous to a quiet station, billing 200 kW instead of 400, which is why it exists. But every 75 kWh you add raises billed demand by a kW until billed demand reaches the real peak, here at 400 × 75 = 30,000 kWh a month. Below that line, overnight energy carries a demand cost of $12.70 ÷ 75, about 16.9 cents per kWh. Above it, added energy costs energy only, the same as GSD-1.
So the right rate depends on the volume you expect. A station selling little energy is better off on the limiter. A station that will sell overnight fleet energy past 75 times its peak should price GSD-1 or GSDT-1, and keep the cap in place either way.
What should overnight AV fleet load never do to your bill?
When an AV fleet charges at your station through XoomPark, we use your unused stalls, never fill them so a retail customer can't charge, and never make you go over your monthly peak. If the other stalls fill, the fleet vehicle leaves to free one.
XoomPark buys the fleet's electricity from you at an agreed bulk rate, so price that rate against the added cost per kWh on your own schedule, as in the example above. See robotaxi charging for fast-charging networks.
When demand charge planning is not your problem
- Your chargers are on a rate without a demand charge, or below the size where one applies. FPL's demand rates start at a measured demand of 25 kW.1
- You only host Level 2 chargers at low power. A few 7 kW ports rarely move a commercial peak.
- You are on an EV limiter rate with little retail volume and a fleet offers less than your added cost per kWh. In our example that is about 20 cents before fuel charges. Say no, or change rates first.
- Your lease or host agreement passes the electric bill to the charging company. Then this is their problem, and their power cap.
What is a demand charge on my power bill?
What is the difference between a demand charge and an energy charge?
How do I calculate my demand charge?
Will a battery eliminate my demand charge?
Does adding overnight AV fleet charging raise my demand charge?
Sources
- Florida Power & Light, Tariff Section 8, rate schedules GSD-1, GSD-1EV and GSDT-1 (effective Jan 1, 2026)
- PG&E, Electric Schedule BEV, Business Electric Vehicles (rates effective Mar 1, 2026)
- NREL, Identifying Potential Markets for Behind-the-Meter Battery Energy Storage: A Survey of U.S. Demand Charges, 2017
- NREL, Muratori, Kontou and Eichman, Electricity rates for electric vehicle direct current fast charging in the United States, 2019
- NREL, Technology solutions to mitigate electricity cost for electric vehicle DC fast charging, 2019 (DOE accepted manuscript)
- RMI: EVgo Fleet and Tariff Analysis press release, April 2017
Sources are public. XoomPark isn't affiliated with the companies referenced in this post.
Authorship
Written by XoomPark Editorial Team in collaboration with Claude Opus 5.5
Role breakdown: Topic selection and publishing by XoomPark Editorial Team; research, source checks against primary sources and draft prose by Claude Opus 5.5.