Demand charge management for site hosts: what sets your bill and how off-peak load fits

One busy half hour can set a fast-charger host's power bill for the month. Which rate you are on, whether the chargers share your meter, and what overnight AV fleet load adds on each rate, with the math.

Your demand charge is set by the single highest 15- or 30-minute block of power your meter records in the month, priced per kW, while the energy charge is priced per kWh. Managing it as a host comes down to three choices: which rate your chargers are on, whether they share the building's meter, and what power cap you set. Whether overnight AV fleet charging costs you anything beyond energy depends almost entirely on the first choice.
Four rate types and what an overnight session below your peak adds (base charges only)
Rate typeHow demand is billedWhat an overnight session below your peak adds
Maximum-demand rate (FPL GSD-1)$12.70 per kW of the month's highest 30-minute demand, any hour1Energy only: 2.825 cents per kWh base1
Time-of-use demand rate (FPL GSDT-1)$11.90 per kW of on-peak demand plus $0.79 per kW of maximum demand1Off-peak energy only: 1.524 cents per kWh base1
EV rate with a demand limiter (FPL GSD-1EV)GSD-1 prices, but billed demand never exceeds the month's kWh divided by 75 hours1While the limiter binds, about 16.9 cents of demand charge per added kWh ($12.70 ÷ 75), plus energy
Subscription rate (PG&E BEV-2-S)$95.56 per 50 kW block, $3.82 per kW overage2Off-peak energy: $0.15654 per kWh, 9 p.m. to 9 a.m.2

What is a demand charge on a power bill?

A price per kW on your highest short burst of power in the billing month. Florida Power & Light measures it as the 30-minute period of the customer's greatest use during the month;1 one busy half hour sets the charge for the whole month, however little energy you sell around it.

The energy charge is the opposite: it scales with kWh and does not care when. That split is why demand charges hurt fast-charger hosts more than most businesses. A few cars charging at once can set a peak of hundreds of kW while the month's energy stays small. RMI's 2017 analysis of fast-charging tariffs found demand charges can make up as much as 90 percent of the monthly bill under certain tariffs,6 and NREL's 2019 rates study found that low utilization leads to significantly higher electricity cost, particularly for rates with demand charges.4

You are not unusual for facing one. NREL's survey of U.S. demand charges counted nearly 5 million commercial customers, over a quarter of 18 million, who can subscribe to tariffs with demand charges above $15 per kW.3

Which rate are your chargers on, and why does it decide everything?

Read the rate schedule name on your bill. On a maximum-demand rate, the height of your peak is what you pay for. On a time-of-use demand rate, the timing is. On a subscription rate, it is the kW you chose in advance. Each treats added off-peak load differently, as the table above shows.

FPL's time-of-use rate, GSDT-1, bills most demand only in on-peak hours: weekdays 6 to 10 a.m. and 6 to 10 p.m. from November through March, and weekdays noon to 9 p.m. from April through October, excluding listed holidays.1 Every hour from 11 p.m. to 6 a.m. is off-peak all year, so overnight charging there can only touch the $0.79 per kW maximum demand charge, and only if it sets a new monthly maximum.

PG&E's business EV rate, BEV, replaces the customer charge and traditional maximum kW demand charge with a subscription-based model for monthly kW allocation.2 You pick a kW level in advance and pay an overage fee above it, so the question there is whether overnight load stays under the subscription, not under a peak you set by accident. These schedules also carry fuel charges, riders and taxes that we leave out here; the demand mechanism is what changes the answer.

Should your chargers share the store's meter or get their own?

It depends on size and use. NREL's 2019 study of fast-charging costs across more than 7,000 commercial rates found that putting a station on an existing commercial meter is almost always economically viable to mitigate fixed cost and demand charges, but the benefit diminishes as station size and utilization increase.5

A shared meter spreads the charger's peaks over the building's load, so a small, lightly used station does not carry its own demand charge alone. The tradeoff is stacking: a charger session at 3 p.m. on top of the store's air conditioning can set a combined peak higher than either alone.

A dedicated meter opens EV-specific rates. FPL's GSD-1EV applies only to public charging with a measured demand of 25 kW to under 500 kW, furnished through a dedicated meter, with a term of not less than one year.1 Price both before you sign anything with a charging company or a fleet.

How do hosts keep the peak down?

Set a site power cap in your charging network's software, stagger session starts, keep fleet charging in off-peak hours, and consider storage if your load is spiky and light. NREL found energy storage alone can help mitigate demand charges and is more effective at reducing costs for peaky or low-utilization loads.5
Levers a site host controls
LeverWhat it does to the demand chargeTradeoff
Site power capHolds the 15- or 30-minute peak under a set kWDrivers charge slower when every stall is busy
Staggered startsStops several sessions ramping in the same intervalNeeds network software that can sequence sessions
Off-peak scheduling for AV fleetsMoves added load to hours that do not set your demand on time-of-use or subscription ratesOnly works with a customer who can charge at night
Battery storageShaves short peaks from storage instead of the gridCapital cost; best on spiky, low-use sites
Rate choiceChanges what a peak costs at allTerm commitments and meter requirements

The depot side of this, from a fleet's own yard, is in our guide to demand charges for AV fleet charging, including how a ratchet can bill one summer peak for a year.

Our worked example: the same overnight load on three FPL rates

Added overnight energy costs a host very different amounts depending on the rate. On our assumptions it adds about 1.5 cents per kWh of base charges on GSDT-1, 2.8 cents on GSD-1, and about 19.8 cents on GSD-1EV until the limiter stops binding. Fuel charges, riders and taxes are excluded.

Method: our arithmetic from FPL's published base rates, not a measured bill. Assumptions: a public four-stall site with an actual 30-minute peak of 400 kW that it already reaches with retail drivers, 15,000 kWh a month of retail sales, and an AV fleet adding 7,200 kWh a month overnight (240 kWh a night for 30 nights) under a 400 kW site cap, so the overnight load never sets a new peak.

The same 7,200 kWh of overnight load on three FPL rates (base charges)
RateDemand charge beforeDemand charge afterAdded base charges for 7,200 kWh
GSD-1400 kW × $12.70 = $5,080$5,080$203 energy (2.825¢ × 7,200)
GSD-1EV15,000 ÷ 75 = 200 kW billed, × $12.70 = $2,54022,200 ÷ 75 = 296 kW billed = $3,759$1,219 demand + $203 energy
GSDT-1Set by on-peak useUnchanged (overnight is off-peak, under the maximum)$110 energy (1.524¢ × 7,200)

Read GSD-1EV carefully. The limiter is generous to a quiet station, billing 200 kW instead of 400, which is why it exists. But every 75 kWh you add raises billed demand by a kW until billed demand reaches the real peak, here at 400 × 75 = 30,000 kWh a month. Below that line, overnight energy carries a demand cost of $12.70 ÷ 75, about 16.9 cents per kWh. Above it, added energy costs energy only, the same as GSD-1.

So the right rate depends on the volume you expect. A station selling little energy is better off on the limiter. A station that will sell overnight fleet energy past 75 times its peak should price GSD-1 or GSDT-1, and keep the cap in place either way.

What should overnight AV fleet load never do to your bill?

Set a new peak. Every overnight session has to stay under the kW the site already reaches, inside a power cap your network software enforces, and slow or stop when retail drivers need the power.

When an AV fleet charges at your station through XoomPark, we use your unused stalls, never fill them so a retail customer can't charge, and never make you go over your monthly peak. If the other stalls fill, the fleet vehicle leaves to free one.

XoomPark buys the fleet's electricity from you at an agreed bulk rate, so price that rate against the added cost per kWh on your own schedule, as in the example above. See robotaxi charging for fast-charging networks.

When demand charge planning is not your problem

  • Your chargers are on a rate without a demand charge, or below the size where one applies. FPL's demand rates start at a measured demand of 25 kW.1
  • You only host Level 2 chargers at low power. A few 7 kW ports rarely move a commercial peak.
  • You are on an EV limiter rate with little retail volume and a fleet offers less than your added cost per kWh. In our example that is about 20 cents before fuel charges. Say no, or change rates first.
  • Your lease or host agreement passes the electric bill to the charging company. Then this is their problem, and their power cap.

What is a demand charge on my power bill?

A price per kW on the highest 15- or 30-minute block of power your meter records in the month. FPL uses 30 minutes; one busy half hour sets the month's charge.

What is the difference between a demand charge and an energy charge?

The energy charge is per kWh and grows with use. The demand charge is per kW of your peak and does not fall when you sell more energy, which is why low-use stations pay the most per kWh.

How do I calculate my demand charge?

Take the billed demand in kW from your bill and multiply by the rate's per-kW price. On FPL GSD-1, a 400 kW peak is 400 × $12.70 = $5,080 a month before other charges.

Will a battery eliminate my demand charge?

Rarely eliminate, often reduce. NREL found storage works best on spiky, low-use loads. Size it against your 15- or 30-minute peaks, not your daily energy.

Does adding overnight AV fleet charging raise my demand charge?

Not on a maximum-demand or time-of-use rate if it stays under your existing peak. On an EV rate with a demand limiter, it can, until your monthly kWh reach 75 times your peak.

Authorship

Written by XoomPark Editorial Team in collaboration with Claude Opus 5.5

Role breakdown: Topic selection and publishing by XoomPark Editorial Team; research, source checks against primary sources and draft prose by Claude Opus 5.5.